SAS falsework Eastern span replacement of the San Francisco–Oakland Bay Bridge
falsework parallel truss bridges temporarily supporting deck segment box structures
the entire deck structure must supported in precise alignment until:
the end caps anchors , turning , tensioning saddles complete.
the tower main cable saddle complete.
all deck segments in place , joined.
the internal tendons placed , tensioned.
the main cable spun.
all suspender cables in place , adjusted tension.
the main cable tension balanced on each side. (this maintained suspender cables tensioned.)
the falsework perform task pair of substantial truss bridges, prefabricated in segments, columns , span segments lifted place barge cranes. trusses supported on foundations consisting of or built atop driven piles. upon completion of bridge, entire falsework structure , exposed underwater supports removed make safe channel deep draft ships transiting , port of oakland.